Ir al contenido principal

CT-EN-004 — Energy Storage (Battery & Grid)

origo_idCT-EN-004
origo_labelEnergy Storage (Battery & Grid)
sectorEN
sourceorigo
cpi_alignedEnergy storage — battery and grid-scale
eu_taxonomy_alignedY — NACE C27.20 manufacture of batteries; D35.11 electricity storage
cbi_eligibleY — Energy storage criteria under CBI, enabling renewable integration
iea_alignedY — IEA ETCS energy storage systems
col_gf_sectorEnergía
col_gf_activityAlmacenamiento de energía para integración de fuentes renovables
col_gf_alignedPartial
col_ndc2030_alignedY — enabling technology for NDC renewable targets requiring grid flexibility
col_sisclima_relevantY
col_ley2169Y — Art. 7 as enabling infrastructure for renewable deployment
latam_colombiaY
cth_clp_coverageN — no CLP companies in storage; emerging market
cth_data_coverageN
schema_version1.1
last_updated2026-05-27

Description

Battery energy storage systems (BESS), grid-scale storage, and behind-the-meter storage solutions. Encompasses lithium-ion, flow batteries, and emerging chemistries. Storage is critical for integrating variable renewables (solar, wind) into grids and enabling off-grid electrification. In Colombia, storage addresses both grid stability during renewable ramp-up and energy access in Zonas No Interconectadas.

Colombia Context

Colombia's grid operator XM has identified energy storage as essential for managing the transition from a hydro-thermal to a hydro-solar-wind system. CREG issued Resolución 098 de 2022 establishing the regulatory framework for energy storage participation in the wholesale market. The TVC includes storage as an eligible activity under the energy sector, though specific technical screening criteria are still being refined. MinMinas' Plan Energético Nacional 2020-2050 identifies storage as a strategic technology. Pilot projects include Enel's BESS in Magdalena Medio and Celsia's behind-the-meter installations. Off-grid storage paired with solar PV is being deployed by IPSE in ZNI communities of Chocó and Vaupés. Colombia has no domestic lithium production, making battery supply chain a strategic import dependency.

EUDR Relevance

This node has no direct EUDR commodity relevance. However, lithium and cobalt supply chains for batteries have broader environmental due diligence considerations under EU Battery Regulation (separate from EUDR).

CTH Data Coverage

No CLP cohort companies are currently in energy storage. This is an emerging market in Colombia with limited SME participation. Future CLP cohorts may include storage integrators as the market develops. Sustenttia diagnostics do not yet include storage-specific assessment modules.

Green Finance Alignment

Partial TVC alignment — storage is recognized but technical screening criteria are evolving. CBI-eligible when demonstrably enabling renewable energy integration. EU Taxonomy aligned under both manufacturing (C27.20) and electricity storage (D35.11) with lifecycle emissions thresholds. GCF and IDB have funded storage pilots in Colombia as part of grid modernisation packages.

{
  "origo_id": "CT-EN-004",
  "origo_label": "Energy Storage (Battery & Grid)",
  "sector": "EN",
  "source": "origo",
  "cpi_aligned": "Energy storage \u2014 battery and grid-scale",
  "eu_taxonomy_aligned": "Y \u2014 NACE C27.20 manufacture of batteries; D35.11 electricity storage",
  "cbi_eligible": "Y \u2014 Energy storage criteria under CBI, enabling renewable integration",
  "iea_aligned": "Y \u2014 IEA ETCS energy storage systems",
  "col_gf_sector": "Energ\u00eda",
  "col_gf_activity": "Almacenamiento de energ\u00eda para integraci\u00f3n de fuentes renovables",
  "col_gf_aligned": "Partial",
  "col_ndc2030_aligned": "Y \u2014 enabling technology for NDC renewable targets requiring grid flexibility",
  "col_sisclima_relevant": "Y",
  "col_ley2169": "Y \u2014 Art. 7 as enabling infrastructure for renewable deployment",
  "latam_colombia": "Y",
  "cth_clp_coverage": "N \u2014 no CLP companies in storage; emerging market",
  "cth_data_coverage": "N",
  "schema_version": "1.1",
  "last_updated": "2026-05-27"
}